Mojave Solar Project – Mirror Project

Mojave, CA

Milco National assembled and erected 22,500 solar modules for a concentrated solar power plant with peak manpower loading of 600 men 2 shifts.

Per the U.S. Dept. of Energy, the 250 MW facility generates enough renewable to power 60,200 homes.