JEA Harp Replacement
Jacksonville Electric Authority
Florida
Titan Contracting & Leasing supplied and installed a total of 30 LP evaporator/economizer harps for two HRSGs during a six-week outage.
Titan developed and successfully utilized a unique system to remove and install the new tube bundles (harps) from the HRSG’s, providing both cost and time savings for the client.